Chat Online
  1. Home
  2. piping through coal mill

piping through coal mill

Two separate mills, referred to as Mill 20 and Mill 40 in this paper, supply pulverized coal to the four PC pipes (and burners) for each elevation. The four PC pipes are located at the four corners of the boiler, and are referred to as corners 10, 20, 30, and 40 in this study (ref. Fig. 3).

Request a quote

Lorem ipsum dolor sit amet, consectetur adipi scing elit, sed do eiusmod tempor incidi dunt ut labore et dolore magna aliqua.

Address High and New Industrial Zone, Kexue Revenue, Zhengzhou, China

E-mail [email protected]

Online consulting Get Latest Price